Steel pipe production process

Fujin Iron and Steel2021-09-29

Internal heating, the temperature is about 1200°C. The fuel is hydrogen or acetylene. The temperature control in the furnace is a key issue. After the round tube is out of the furnace, it must be pierced through a pressure punching machine. 

Generally, the more common piercing machine is the tapered roller piercing machine. This type of piercing machine has high production efficiency, good product quality, large perforation diameter expansion, and can wear a variety of steel types. After piercing, the round tube billet is successively cross-rolled, continuous rolled or extruded by three rolls. After squeezing, take off the tube and calibrate. The sizing machine uses a tapered drill bit to rotate at a high speed into the steel blank to punch holes to form a steel pipe. The inner diameter of the steel pipe is determined by the length of the outer diameter of the drill bit of the sizing machine. After the steel pipe is sized, it enters the cooling tower and is cooled by spraying water. After the steel pipe is cooled, it will be straightened. 

After the steel pipe is straightened, it is sent to the metal flaw detector (or hydraulic test) by the conveyor belt for internal flaw detection. If there are cracks, bubbles, etc. inside the steel pipe, it will be detected. After the quality inspection of steel pipes, strict manual selection is required. After the quality inspection of the steel pipe, paint the serial number, specification, production batch number, etc. with paint. It is hoisted into the warehouse by a crane.

MORE>>Related News